Food Processing – Rochester, PA
Retrofit: Completed over a weekend to minimize production downtime, this 600 HP boiler modernization included a ProFire burner conversion, Cleaver-Brooks Hawk controls, VFD, parallel positioning, O₂ trim, new refractory and electrical upgrades.
The boiler was installed and operational in time to maintain critical steam production.
Healthcare – Erie, PA
Retrofit: A Balance of Plant (BoP) upgrade at a hospital—replacing two outdated Preferred Instruments panels (Plant Master and Feedwater) with a single, modern PLC/HMI-driven control panel. All completed with continued operations and no downtime!
Healthcare – Erie, PA
Retrofit: Our team upgraded the boiler with a dual-fuel Cleaver-Brooks Hawk 4000 control system, replacing old Preferred Instruments controllers with modern draft control, precision feedwater control, and a new Siemens natural gas train for safer, more reliable operation.
Healthcare – Buffalo NY
Replacement: CBEX 400 HP steam firetube boilers, Cleaver-Brooks Spraymaster Deaerator and Dual Tank
Healthcare
Retrofit: Siemens natural gas train upgrade
Institution
Retrofit: System controls upgrade for a cancer center’s boilers.
Chemical Company
Retrofit: Low NOx ProFire V burner up to 30 ppm with Siemens LMV 51 with parallel positioning
Medical Facility
New Equipment: Fulton VMP tubeless steam boilers supporting medical facility demands.
Correctional Facility
Retrofit: Burner upgrade, controls retrofit and upgrades for increased operating efficiencies, reliability and reduced emissions.
Food Processing
Retrofit: Controls and burner components retrofit for increased efficiency and improved fuel-to-air-ratio control.
Buffalo Public School
Retrofit: (3) Steam boilers, Profire V burner upgrades with parallel positioning and Siemens draft control.
University Central Plant
Controls Retrofit: Cleaver-Brooks CBLE Firetube boilers, Kewaunee Boilers with Advanced Hawk Controls.
Dog Treat Manufacturing Facility
Controls Retrofit: Boosted efficiency with new Cleaver-Brooks Hawk Control upgrade with operator-friendly PLC touchscreen and upgraded burner components for precise fuel-to-air-ratio control.
Correctional Facility
Retrofit: CBXL burner retrofit on a Trane Murray 30,000 lb/steam boiler. Cleaver-Brooks model CBLE controls upgrade and to lower emissions, and increase efficiency
Vehicle Manufacturer
New Equipment: (2) CBEX firetube boilers
Education:
New Equipment: (3) Raypak Xvers for school heating
Education
New Equipment: (2) Flexible Watertube field-erectable hot water boilers.
Healthcare: Rental
Hydronic Boiler System Rental
Industry type
New Equipment: (2) Hydronic PK Thermific Velox 850